Description of Incident
A high voltage arc occurred inside a ROV tether termination manifold. The ROV
HPU Breaker tripped during the return of the ROV to the TMS. Initial investigation
into the trip was conducted and findings indicated no hard fault was present. The
ROV crew performed a reset of the breakers and restarted the ROV HPU to recover
it to the TMS.
Approximately 3 hours later, it was noted that the line insulation monitoring system
for the ROV HPU was reading 12 M/Ohms, which under normal operation would
read >60 M/Ohms. Upon investigation after recovery to deck, the crew found there
was approx. 80mm of gas at the top of the tether termination manifold.
The system was isolated; the gas was vented out and the oil was drained out of the
manifold. Inside the manifold it was noticed that one of the ROV HPU conductors
had dislodged from its crimp which had in turn caused electrical arcing in the
manifold.
To view this IMCA Safety Flash in full, click the 'Download' Alert button above.
Rate this alert
Average Rating
Latest Alerts & Moments
Our searchable catalogue of hundreds of Safety Alerts and Safety Moments are all designed as learning resources that can help improve workplace safety.